We want to make it as easy as possible for you to contibute your thoughts on the proposals for the A4 Bath to Bristol project. We've outlined the proposals by each area and by the short and long term proposed changes in downloadable documents.
Factsheets
Download our factsheets here.
Brislington and Totterdown - Short term changes
Brislington and Totterdown - Longer term changes - Option 1
Brislington and Totterdown - Longer term changes - Option 2
Brislington Park & Ride - Hicks Gate Roundabout
Keynsham: Hicks Gate roundabout – Broadmead roundabout
Local cycling and walking maps
Download the local cycling and walking maps here.
Bristol and Bath Railway Path improvements
Grange Road and Claverton Road - Saltford
Norman and Beech Road - Saltford - 1 of 3
Norman and Beech Road - Saltford - 2 of 3
Norman and Beech Road - Saltford - 3 of 3
Junction maps
Download the junction maps here.
Option 1 - Proposed junction of bus and through traffic routes
Option 1 - Proposed Three Lamps junction
Option 2 - Proposed junction of bus and through traffic routes
Questionnaires
You can download the questionnaires for each area here. Once completed send to us at Bath to Bristol A4 Consultation Team, West of England Combined Authority 70 Redcliff Street, BS1 6AL.